Meijer-1706-SRH-4
The Situation:

Meijer’s expansion into Wisconsin began in 2014 and has continued at a fast pace since then. KMI was hired to complete their second store in Wisconsin, located in Wauwatosa.

The Solution:

The project included over 20,000 CMU, 86,000 utility brick, 7,000 SF of stone veneer, and precast accent throughout the masonry.  With an August 2015 opening date, KMI was required to complete the majority of the work throughout the course of the winter months.